Botella gotero azul degradado en stock 5ml 10ml botella para líquido 15ml gotero de aluminio electroquímico botella gotero para perfume
Precio por pieza incluyendo entrega a México
Variaciones
Gradient blue bottle + black cover 5ml(280 PCs/Board)
Gradient blue bottle + black cover 10ml(280 PCs/Board)
Gradient blue bottle + black cover 15ml(280 PCs/Board)
Especificaciones del producto
Origen
Guangzhou
Modelo
LJ2580
Tipo de producto
Travel suit, Essential oil bottle, Incense bottle, Lotion Bottle, Cosmetic bottle, Cosmetic jar, Other
Material
Glass
Variedad de plástico
Other
Accesorios relacionados
Electrochemical aluminum ring, rubber head, dropper
Presupuesto
Gradient blue bottle + black cover, Gradient blue bottle + silver cap, Gradient blue bottle + gold lid
Artesanía
Blow bottle
Tratamiento de superficies
Spray color, Silk Screen, Bronzing, Hot Silver, Sand
Marca
Lizhi
Capacidad
The whole board is shipped, please place an order according to the number of the whole board (please contact C...
error
0.01
Embalaje especial
Cosmetic Packaging
Origen
Guangzhou
Modelo
LJ2580
Tipo de producto
Travel suit, Essential oil bottle, Incense bottle, Lotion Bottle, Cosmetic bottle, Cosmetic jar, Other
Material
Glass
Variedad de plástico
Other
Accesorios relacionados
Electrochemical aluminum ring, rubber head, dropper
Presupuesto
Gradient blue bottle + black cover, Gradient blue bottle + silver cap, Gradient blue bottle + gold lid
Artesanía
Blow bottle
Tratamiento de superficies
Spray color, Silk Screen, Bronzing, Hot Silver, Sand
Marca
Lizhi
Capacidad
The whole board is shipped, please place an order according to the number of the whole board (please contact C...
error
0.01
Embalaje especial
Cosmetic Packaging
Origen
Guangzhou
Modelo
LJ2580
Tipo de producto
Travel suit, Essential oil bottle, Incense bottle, Lotion Bottle, Cosmetic bottle, Cosmetic jar, Other
Material
Glass
Variedad de plástico
Other
Accesorios relacionados
Electrochemical aluminum ring, rubber head, dropper
Presupuesto
Gradient blue bottle + black cover, Gradient blue bottle + silver cap, Gradient blue bottle + gold lid
Artesanía
Blow bottle
Tratamiento de superficies
Spray color, Silk Screen, Bronzing, Hot Silver, Sand
Marca
Lizhi
Capacidad
The whole board is shipped, please place an order according to the number of the whole board (please contact C...
error
0.01
Embalaje especial
Cosmetic Packaging
Detalles del producto
El texto en las imágenes se puede traducir























Total
Entrega
IVA
Otro